witty — Audit
Audit
witty — Mirror
Mirror
witty — Business Model Canvas
Business Model Canvas
witty — Glossary
Glossary

witty

ConsultingBuildingManagementDesignEarly Stage7 Days

witty started as my own product-management awareness companion. It walks me through fourteen steps from spark to snapshot, and audits in hindsight which methods are already practised.

It’s named after Wittgenstein: the limits of my language mean the limits of my world. You can only build in the directions you have language for.

Built with

  • Static HTML, CSS and JavaScript, no build step
  • Markdown as the source of truth

The methodological source of truth is a markdown document. Fourteen steps, each with its guiding question, method, output format and done criterion, plus an experiment layer for validation.

The audit prompt is a translation of that schema. When the schema changes, the prompt follows — the document leads, not the tool.

In numbers

2026 7 Days

  1. Schema in markdown
  2. Prompt follows it
  3. Hindsight audit
  4. Bilingual from day one

Naming a method you already use is what makes it repeatable. That is the whole bet of the hindsight audit.

Plain language first, the textbook term as a learning anchor. Methods are options, never obligations.

What's next

Actively built Next: restructure and declutter the interface and the workflow

What can Iget out ofyour way?

Reach out